Garden Office – Update 1

image

Had a busy weekend with the garden office construction. The floor joists and back wall timber frame is complete and two of the three sides are now up.
Spending time getting the base level was very worthwhile as the build is going up fast and is surprisingly straight and true.

The roof is pitched at 6 degrees and looks exactly as I pictured in my mind.
Hopefully the rest of the timber frame will be up this week and then it’s time to roof and wrap.